USA Hockey
Training Facility
Training Facility
Plymouth,MICHIGAN
project profile
USA Hockey Training Facility is a new multi-use indoor arena in Plymouth, Michigan. This state of the art 26,000 sq ft arena opened in May of 2016.
installation
YEAR
YEAR
2016
size of
installation
installation
26,000 sq.ft.
SPECIFICATIONS:
Tiles
Construction: Dual-Layer Vulcanized Rubber
Thickness: 10mm, 8mm, 6mm
Size: 1 m x 1 m (39.4' x 39.4')
Area: 10.75 sq.ft.
Finish: Matte
Construction: Dual-Layer Vulcanized Rubber
Thickness: 10mm, 8mm, 6mm
Size: 1 m x 1 m (39.4' x 39.4')
Area: 10.75 sq.ft.
Finish: Matte
FORMATS:
Available in standard square edge tile or roll format, and interlock 10mm tile.
Available in standard square edge tile or roll format, and interlock 10mm tile.
Roll
Construction: Dual-Layer Vulcanized Rubber
Thickness: 10mm, 8mm, 6mm
Size: 1.22 m (4")
Area: 120 sq.ft.
Finish: Matte
Construction: Dual-Layer Vulcanized Rubber
Thickness: 10mm, 8mm, 6mm
Size: 1.22 m (4")
Area: 120 sq.ft.
Finish: Matte
our work:
Sports Courts • Ice Rinks • Weight Rooms • Fitness Rooms and more
October 24, 2018
CANE BAY YMCA
October 24, 2018
UBC Thunderbirds Baseball
October 24, 2018
Steve Nash Fitness Club
October 24, 2018
USA Hockey Training Facility
October 24, 2018
Rogers Place Arena
October 23, 2018