Mansfield
high school
high school
Mansfield, Massachusetts
project profile (work in progress)
Mansfield High School (MHS) is a four-year, comprehensive public high school located in Mansfield, Massachusetts.
installation
YEAR
YEAR
2019
size of
installation
installation
tbd
product installed
SportFloor Elite System 11.5mm tile
SPECIFICATIONS:
Tiles
Construction: Multilayer Vulcanized Rubber Thickness: 24mm, 18mm, 11mm Size: 1m x 1m (39.4" x 39.4") Area: 10.75 sq.ft. Finish: Matte
Construction: Multilayer Vulcanized Rubber Thickness: 24mm, 18mm, 11mm Size: 1m x 1m (39.4" x 39.4") Area: 10.75 sq.ft. Finish: Matte
FORMATS:
Standard square edge format, or can be optionally interlocked for easier installation.
Rolls
Construction: Multilayer Vulcanized Rubber Thickness: 24mm, 18mm, 11mm Width: 1.22m (4') Length: (10mm, 8mm): 9.144m (30') (6mm, 3.5mm): 15.24m (50') Area: (10mm, 8mm): 120 sq.ft. (6mm, 3.5mm): 200 sq.ft. Finish: Matte
Construction: Multilayer Vulcanized Rubber Thickness: 24mm, 18mm, 11mm Width: 1.22m (4') Length: (10mm, 8mm): 9.144m (30') (6mm, 3.5mm): 15.24m (50') Area: (10mm, 8mm): 120 sq.ft. (6mm, 3.5mm): 200 sq.ft. Finish: Matte
Our Work:
Sports Courts • Ice Rinks • Weight Rooms • Fitness Rooms and more
October 24, 2018
CANE BAY YMCA
October 24, 2018
UBC Thunderbirds Baseball
October 24, 2018
Steve Nash Fitness Club
October 24, 2018
USA Hockey Training Facility
October 24, 2018
Rogers Place Arena
October 23, 2018












